Independent sourcing representation · based in ShenZhen, China

Your China sourcing desk,
without the China office.

I help overseas pet-tech and small-appliance brands source from China without a local team — from vetted factories and open-BOM pricing to golden samples and pre-shipment inspection. Ten years on the factory floor in consumer electronics and pet appliances, so you don't have to fly here to know what your money is buying.

Email me and we'll set up a 30-minute call — no pitch. If it's not a fit, I'll say so.

10 years in China sourcing Fixed, disclosed fee No hidden markups You pay the factory directly
Same spec. Two quotes.Quote comparability check
Cost lineSupplier ASupplier B
Unit price (FOB)$8.40$7.15
Housing materialABS, 2.4 mmABS, 1.8 mm
Pump rating20,000 hrs8,000 hrs
PCB conformal coatingIncludedNot listed
Tooling amortised over20k units5k units
The cheaper quote wasn't cheaper. It was a different product — and none of the differences appeared on the quotation.

Illustrative example, not a client quote. The job is making two quotes comparable before anyone compares them.

The problem

The quote looked fine. The trouble was what it didn't say.

Most sourcing problems don't start on the factory floor. They start in a spreadsheet where two quotes were never actually for the same product.

01 / Comparability

Quotes that can't be compared

Different MOQ tiers, Incoterms, tooling assumptions and material grades, all presented as one unit price. A "9% saving" is often a spec reduction in disguise.

02 / Verification

A factory you've only seen in photos

Certificates that were never verified with the issuing body, a "factory" that is a trading office, and a production line that belongs to someone else.

03 / Consistency

A sample that the mass run doesn't match

No signed golden sample, no first-article check, no AQL inspection before the balance is released. The problem shows up in reviews eight weeks after launch.

Services

Five ways to work together, from a free checklist to an ongoing desk.

Every engagement has a written scope, named deliverables and an acceptance test. Nothing starts on a handshake and nothing is billed by the hour.

T0 · Free

Tools & intro call

The 12-point supplier vetting checklist, an RFQ template, and a 30-minute call. No supplier names, no obligation.

$0
T1 · Start here

Feasibility Diagnostic

Can this product be made, what will it roughly cost, where are the risks, and Go / No-Go? A 15–25 page report you keep either way.

2–3 weeks · fixed fee
T2

Sourcing & RFQ

Frozen spec, 12-point vetting, 3–5 vetted factories, ≥3 comparable quotes, open-BOM breakdown, sample evaluation and a negotiation playbook.

4–8 weeks · fixed fee
T3

Full project delivery

Factory audit and CAPA, golden sample, contract / PO consistency, first-article inspection, AQL pre-shipment inspection, weekly reporting to sign-off.

Stage-Gate · milestones
T4

Retainer · your desk

Monthly sourcing report, supplier scorecard, risk watchlist and quarterly cost-down / second-source proposals. Three months minimum.

Monthly · 3-month min.
Not a fit?

If you're looking for the lowest price without a signed spec sheet, want someone to handle payment to the factory, or need a full guarantee on factory delivery, I'm the wrong person — and I'll tell you that on the first call rather than waste your budget.

Pricing · in the open

No "contact for pricing". Here is what it costs.

All fees are fixed, disclosed in writing before we start, and paid by you in USD. You sign the purchase contract with the factory and pay the factory directly — I never touch your goods payment.

T1 · Diagnostic
$1,000
one-off · 100% prepaid
6 deliverables, written Go / No-Go, 30-minute walkthrough. Priced below one international flight.
T2 · Sourcing & RFQ
$3,000
one-off · 50% / 50%
Scaled by category complexity and number of candidate factories. Samples and lab testing billed separately.
T3 · Full delivery
$4,000
one-off · milestone-based
Higher for new tooling or complex certification. Each Stage-Gate release triggers the next invoice.
T4 · Retainer
$3,000
per month · 3-month minimum
Monthly reporting, scorecards and risk watchlist. A written baseline is locked before any gain-share is calculated.

À la carte: on-site factory audit or pre-shipment inspection $200 / person-day plus travel at cost. Travel, samples, testing and certification are passed through with receipts; any single expense above $500 needs your written approval first. Long-term clients can add a gain-share on verified, sustainable first-year savings, defined in writing in advance.

How I'm paid — the short version

"One disclosed fee, paid by you. No hidden markup. You sign with the factory and pay them directly — I'll show you exactly what I'm paid and why." You can audit that from the contract.

How it works

Four phases. Twelve gates. Nothing moves without a signed deliverable.

Each gate has a named deliverable, an acceptance test and — on project work — a payment trigger. You always know what has been approved, what is pending and what comes next.

1

Freeze the spec

Spec Sheet v1.0 signed by you. Later changes go through a written Change Order, so "we agreed something else" never becomes an argument.

2

Vet & compare

12-point background checks, a shortlist of 3–5 factories (code names until gate release), ≥3 comparable quotes and an open-BOM cost breakdown.

3

Sample & audit

Sample evaluation against spec, on-site audit with CAPA, a golden sample signed by both sides with six-side photos and a unique ID.

4

Produce & sign off

Contract / PO consistency check, first-article inspection, in-production checkpoints, AQL pre-shipment inspection, then a signed Acceptance Certificate.

One source of truth

A live Stage-Gate tracker links every gate to its deliverable number, release record and invoice. Progress and billing are never two separate conversations.

Deliverables

What actually lands in your inbox.

Every deliverable has a reference number (D-01 … D-28), an owner, a due gate and an acceptance anchor. The same numbering appears in your SOW annex, the acceptance certificate and the change log.

T1 · D-01 – D-06

Diagnostic pack

  • Diagnostic report
  • Cost range & assumptions
  • Category supply map (≥3 clusters)
  • Risk register, 6 categories
  • Go / No-Go decision matrix
  • Walkthrough + recording
T2 · D-07 – D-13

Sourcing pack

  • Signed Spec Sheet v1.0
  • 12-point vetting sheets
  • Vetted shortlist
  • RFQ comparison matrix
  • Open-BOM cost breakdown
  • Sample notes & negotiation playbook
T3 · D-14 – D-21

Delivery pack

  • Factory audit & CAPA
  • Golden sample sign-off
  • Contract / PO consistency
  • First-article inspection
  • AQL pre-shipment report
  • Weekly report, gate tracker, retrospective
T4 · D-22 – D-25

Retainer pack

  • Monthly sourcing report by the 5th
  • Supplier scorecard, A/B/C
  • Risk watchlist with triggers
  • Quarterly cost-down proposal
  • Written baseline & exclusions
  • Recomputable gain-share calculation
ALL · D-26 – D-28

Commercial control

  • Deliverables checklist (SOW Annex A)
  • Gate release & acceptance log
  • Change log with fee & schedule impact
  • 5-business-day deemed-acceptance rule
  • One numbering system end to end
The standard

Every number has a source

  • Every figure carries a source and a date
  • No blank cells — write N/A
  • Quotes are comparable: same spec, Incoterm, MOQ tier
  • Critical defects: zero tolerance at AQL inspection
  • Estimates are labelled "not a quotation"
Conflicts of interest & scope

What I do, and what I won't do.

The boundary is the product. It's why the advice is worth anything.

What you get

  • A fixed fee, disclosed in writing before work starts
  • Only one side paying me: you
  • Your contract with the factory, your payment to the factory
  • Comparable quotes and an open BOM — not a promise of the lowest price
  • Process control: vetting, signed samples, checkpoints, AQL inspection
  • NDA before disclosure, code names while quoting, explicit mold-ownership clauses
  • Me personally — not a junior account manager

What I won't do

  • Take a hidden markup or an undisclosed supplier-side commission
  • Receive, hold or forward your payment to a factory, or finance your orders
  • Guarantee factory quality, delivery dates or a "lowest price on the market"
  • Guarantee or compensate for a factory's contractual performance
  • Give legal, tax, customs or investment advice — your lawyer reviews final wording
  • Handle counterfeits, certification avoidance or false origin documents
  • Disclose your information, or a factory's, without authorisation
Why no lowest-price guarantee

"No, and I'd be suspicious of anyone who does. I guarantee comparable quotes, an open BOM, and that every cost line is explainable. A cheaper quote usually means something was removed — my job is to show you what." The factory carries contractual responsibility for its own product and delivery; that's exactly why you sign with them directly.

Free · no call needed

The 12-point supplier vetting checklist.

The same 12 items I run before a factory ever reaches a shortlist. Tick them as you go, or print it and take it to the factory. Nothing is gated behind a form.

0 / 12 checked
About

You get me, standing on the factory floor.

10
Years in China sourcing
  • Consumer electronics & small appliances
  • Pet appliances / pet tech
  • Injection molding, tooling, full product delivery
  • Based in ShenZhen, China
  • Working in English with overseas teams

I'm Gian Wong. I spent ten years sourcing consumer electronics and small appliances in China — including pet appliances, injection molding, tooling and full product delivery. Now I work on the buyer's side for overseas brands that don't have a China team.

What I actually do: find and vet factories, put 3+ comparable quotes side by side, break down the BOM so you know what you're paying for, run sampling, factory audits and pre-shipment inspection, then build second sources and negotiate annual cost-downs.

How I'm paid: a fixed, disclosed fee. I never take a hidden markup, and you sign the purchase contract and pay the factory directly. If any supplier-side compensation ever existed, it would be disclosed in writing. I only work on the buyer's side — you can audit that.

Single point of contact, no subcontracting to a junior account manager. If a project needs third-party lab testing or inspection, I bring in SGS / Intertek-level resources at cost, disclosed in advance.

FAQ

The questions I get on every first call.

Why not just use Alibaba or a trading company?

Platforms give you listings. My job is what happens after the listing: verifying the factory actually runs that line, making three quotes comparable, and being there when the golden sample and the mass-production unit don't match. You're not paying for access — you're paying for judgment and control.

How do I know you're not paid by the factory?

You'll see my fee in the contract, and you pay the factory directly — I never touch your goods payment. If any supplier-side compensation ever exists, it's disclosed in writing. I only work on the buyer's side. You can audit that.

Can you guarantee the lowest price?

No, and I'd be suspicious of anyone who does. I guarantee comparable quotes, an open BOM, and that every cost line is explainable. A cheaper quote usually means something was removed — my job is to show you what.

What if the factory ships late or the quality is bad?

The factory carries that contractual responsibility — that's why you sign with them directly. My responsibility is process: a vetted shortlist, a signed golden sample, in-production checkpoints, and AQL pre-shipment inspection before you release the balance. And I'll always have a second source ready.

Why do I pay before seeing any supplier names?

That's why I start with a small, fixed-scope diagnostic instead of a big project. It has six written deliverables you keep either way, and a clear Go / No-Go. If it isn't useful, we stop there — no long commitment. A list of names isn't the product; the judgment is.

We already have a supplier. What do you add?

Then I'd start with an open-BOM review and a second-source plan. Most brands with a single supplier are paying for it in ways that never appear on the quote — tooling amortization, no tiered pricing, and no leverage when capacity gets tight.

How do you protect our IP and tooling?

NDA before any disclosure, explicit mold-ownership clauses, factory non-solicitation of your end customers, code names during quoting, and splitting critical components where it makes sense. Your lawyer reviews the final wording — I provide the clause pack and negotiate it.

Why a solo consultant, not an agency?

You get me, not a junior account manager. One point of contact, fast written responses, and I'm the person standing on the factory floor. If a project needs third-party lab testing or inspection, I bring in SGS / Intertek-level resources at cost, disclosed.

Next step

30 minutes. Bring a quote if you have one.

A discovery call is a fit check, not a free consultation and not a pitch. Email me with the six points below and we'll agree on a time. I'll tell you what a first engagement would cost and deliver — or say plainly that it isn't a fit.

To make the call useful, put these six things in your email
  1. The product / category and your target market
  2. Where you are now — idea, sample, or already in production
  3. Approximate annual order value and MOQ
  4. The one thing about your current supplier that bothers you most
  5. Your target timeline
  6. Your budget range for the engagement